Large commercial flake floor installed by Epoxy Boss in Mississauga, Ontario

A commercial epoxy floor in Mississauga succeeds or fails on planning: the right system for each area, a realistic preparation scope, and a schedule that keeps the business running. Retail units, offices, showrooms, warehouses and production plants each need something different, and many commercial slabs carry old coatings, glue or tile mortar that must come off before anything new goes down. This guide walks through how a commercial project is planned, using real Epoxy Boss projects in Mississauga as examples.

Start with how each area is used

Most commercial buildings need more than one floor system. Before choosing a product, list each area and how it is used:

  • Customer-facing areas: showrooms, retail floors and lobbies, where appearance and easy cleaning matter most. Decorative flake, solid colour or metallic systems are common.
  • Back-of-house and offices: steady foot traffic and carts. Solid colour or flake systems with a durable topcoat.
  • Production and warehouse areas: forklifts, pallet jacks, chemicals and impact. High-build industrial epoxy with joint repair and safety lines.
  • Wet areas and kitchens: washdown, textured finishes and an integral cove base.

For an overview of options, see our commercial flooring page and commercial epoxy flooring.

Expect to remove what is already there

Many Mississauga units change tenants and uses, so the slab often carries the last tenant's floor. Old coatings, carpet glue, tile mortar and mastic all interfere with a new resinous system and must be removed mechanically. This is often the biggest variable in a commercial scope.

On a commercial interior project on Argentia Road, Phase 1 covered 7,193 sq ft. Old coating, glue and tiling mortar were removed with PCD diamond tooling, the concrete was ground to a CSP 3 profile, cracks were repaired and re-ground, and a full-broadcast flake system was installed with a polyaspartic topcoat containing fine aluminum oxide for slip resistance. See Phase 1 of the Mississauga commercial flake floor.

The next stage at the same address covered 15,963 sq ft across two units, including the areas beneath temporary wood structures, with the same removal-first approach. See Stage 2. Related services: floor coating removal, glue removal and mastic removal.

Preparation is specified, not assumed

A good commercial scope names the preparation method and the target surface profile. Diamond grinding or shot blasting opens the concrete so the coating can bond; acid etching is not a substitute. The scope should also say how cracks, joints and damaged areas will be handled and whether moisture testing is included. See concrete surface preparation and joint filling.

Plan around operations

Downtime is often the real cost of a commercial floor. Common ways to keep the business running:

  • Phasing: the floor is split into zones so part of the space stays open while another is coated.
  • After-hours and weekend work: especially for retail and offices.
  • Fast return-to-service systems: where closing for days is not possible. See fast return-to-service flooring.
  • Coordination with other trades: on fit-outs, the floor is scheduled around framing, electrical and fixtures.

At an automotive production facility in Mississauga, about 6,000 sq ft was coated while the plant stayed active, with shipments and other trades on site. The scope included grinding, crack and pitting repair, removal of embedded metal, joint and stress-cut filling, an epoxy system and precision safety lines, with the line layout adjusted on site where the drawings were inconsistent. See the industrial flooring and line marking project.

Safety lines and markings

Warehouses and production floors usually need aisle lines, hazard zones and equipment areas marked. Lines are best planned with the floor, so layout, colours and widths are agreed before the coating schedule is set. See warehouse safety striping.

What a commercial quote should include

  • Each area, its size and the system specified for it.
  • The removal and preparation method, with the target surface profile.
  • Crack, joint and spall repair, listed with quantities.
  • Moisture testing, if required, and what happens if moisture is high.
  • Cove base, line marking and any special details.
  • Phasing, working hours and return-to-service times for each area.
  • Warranty terms in writing, pre-tax, in Canadian dollars.

For budgeting, read our commercial epoxy flooring cost guide or start with the floor cost calculator.

Frequently asked questions

Can you install a commercial floor while we stay open?

Often yes, by phasing the work by area or scheduling after hours. The production plant project above was completed while the facility stayed active.

Do old coatings and glue have to be removed?

In most cases, yes. A new coating is only as strong as what it bonds to, so loose or incompatible layers are removed mechanically first.

Which system is best for a warehouse?

It depends on traffic and chemicals. Many warehouses use a high-build epoxy or polished concrete, with joint repair and safety lines. See our warehouse floor options and forklift traffic and floor joints.

Do you work in Brampton and Oakville too?

Yes. We serve Mississauga, Brampton, Oakville and the wider GTA from our base in Innisfil.

Get a written commercial quote

Epoxy Boss installs commercial and industrial floors across the GTA, York Region, Simcoe County, Halton, Durham and Muskoka. Call (905) 775-5901 or book a free floor assessment for a written quote in Canadian dollars.

On this page

Table of Contents

Projects

Flake Garage Floor in King, Ontario
King Flake Garage Floor
~300
Sq Ft
Flakes System
King City
Garage Floor Coating
Flake Backyard Patio Coating in Vaughan, Ontario
Vaughan Flake Patio Coating
~400
Sq Ft
Flakes System
Vaughan
Patio
Flake Garage Floor in Innisfil, Ontario (2021)
Innisfil Flake Garage Floor 2021
~450
Sq Ft
Flakes System
Innisfil
Garage Floor Coating
Interior Epoxy Floor Coating in Guelph, Ontario
Guelph Interior Epoxy Floor
~200
Sq Ft
Metallic System
Basement & Indoor Spaces
Flake Entrance Landing and Steps in Barrie, Ontario
Barrie Flake Entrance & Steps
~100
Sq Ft
Flakes System
Barrie
Porch
Exterior Flake Entrance Coating in Halton Hills, Ontario
Halton Hills Exterior Flake Entrance
~150
Sq Ft
Flakes System
Halton Hills
Porch
Flake Garage Floor in Muskoka Lakes, Ontario
Muskoka Lakes Flake Garage Floor
~800
Sq Ft
Flakes System
Muskoka Lakes
Garage Floor Coating
Flake Floor Coating in Pickering, Ontario (2021)
Pickering Flake Floor Coating
~450
Sq Ft
Flakes System
Pickering
Garage Floor Coating
See More ProjectsView Photo Gallery

Ready to Upgrade Your Floors?

Custom epoxy systems tailored for garages, basements, showrooms, patios, and industrial environments — combining industrial-grade durability with premium aesthetics.

How we work

Coated concrete floor by Epoxy Boss in Ontario
01

First Contact

Reach out by phone, email or our online form. We'll ask a few questions about your space, how it's used and the finish you have in mind, and review photos if you have them.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

Decision making

We help you choose the right system, finish, and colours based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.