(905) 775-5901Talk to an estimator
Polyurethane flooring installed by Epoxy Boss

Polyurethane & Urethane Flooring in Simcoe County & the GTA

Free Assessment
Polyurethane and urethane flooring in Simcoe County and the GTA, with chemistry and finish matched to the property's use and substrate.

Get a Free Floor Assessment

Tell us what you need, leave your phone number, and add a photo of your floor if you want to. We'll get back to you within one business day.

What do you need?

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Urethane floor coating on a concrete slab

Polyurethane & Urethane Flooring

Polyurethane coatings and urethane cement are different types of assembly. We review the intended use, substrate and exposure before recommending which approach belongs in the floor specification.

Explain whether the priority is a protective topcoat, a decorative finish or a demanding processing-floor system. We will clarify the proposed build-up and why it suits that use.

This is part of our concrete coating service. Related work: urethane cement, polyurethane topcoats and chemical resistant epoxy flooring.

Service Inclusive

Every project may include:

Slab Assessment

For polyurethane & urethane flooring, the floor is checked before the coating is chosen.

  • Moisture and contamination checks
  • Crack and joint survey
  • Traffic and use review

Mechanical Preparation

Grinding opens the concrete so the coating can bond.

  • Diamond grinding to profile
  • Old coatings and sealers removed
  • Dust and debris vacuumed off

Repairs Before Finish

Damage is corrected so it does not telegraph through.

  • Crack and joint repair
  • Spall and pit filling
  • Substrate correction

Polyurethane & Urethane Installation

The steps carried out on site for this system.

  • Urethane or polyurethane layers by zone
  • Thickness set by impact and temperature
  • Topcoat matched to cleaning routine

Edges & Transitions

Where floors usually fail first.

  • Door lines and thresholds
  • Wall edges and columns
  • Joints honoured or filled

Handover & Care

Handover with clear timing and cleaning advice.

  • Walk-on and drive-on times
  • Cleaning product guidance
  • Inspection before handover

Surface

Floor Performance Depends On:

Impact & Abrasion

Dragged equipment, carts and dropped tools.

Temperature Range

Hot water, steam or cold rooms.

Moisture Vapour

Moisture rising through the slab.

Substrate Condition

Age and soundness of the concrete.

Traffic Conditions

Foot, vehicle and equipment load.

Chemical Contact

Oils, salts and cleaning products.

Temperature at Install

Slab and air within product range.

Long-Term Durability

Expected service life and upkeep.

Why Epoxy Boss

Epoxy Boss operates as a concrete surface preparation and protection company specializing in technical flooring systems across Ontario.
Our operational structure includes:
  • specialized installation crews
  • industrial-grade preparation equipment
  • project management systems
  • field supervision
  • structured quality-control procedures
  • commercial-scale operational capability
Projects are approached through:
  • substrate analysis
  • preparation-first installation
  • environment-specific system selection
  • moisture management
  • operational workflow planning
  • long-term durability objectives
The company maintains:

Epoxy Boss has completed projects ranging from residential garage systems to large-volume industrial operations for manufacturing and commercial facilities across multiple sectors.

  • WSIB coverage
  • structured operational workflows
  • safety compliance standards
  • commercial project coordination systems
  • large-scale production capability

Because high-performance flooring is not defined byappearance alone. It is defined by how the surface performs under years ofreal operational use.

Coated concrete floor by Epoxy Boss in Ontario

FAQ

What do food facility floors need to meet in Ontario?

Federally licensed food businesses operate under the Safe Food for Canadians Regulations, and provincially regulated operations under Ontario's rules. Either way, the expectation for floors is a durable surface that can be cleaned effectively, drains properly and doesn't harbour contamination. The specific requirement comes from your inspector and your food safety plan. We build to the specification you're held to, and provide the product data to support it.

Related: polyurethane and urethane flooring and urethane cement flooring.

Can damaged concrete be repaired before installation?

Yes. Crack remediation, joint stabilization, moisture mitigation and substrate correction are commonly performed before flooring installation.

Related: polyurethane and urethane flooring and concrete crack repair.

Why is grinding important before urethane flooring installation?

Grinding creates the concrete profile required for strong mechanical adhesion between the flooring system and the substrate.

Related: polyurethane and urethane flooring.

Are polyurethane floors slip resistant?

Slip resistance can be incorporated through aggregate systems and textured finishes depending on operational safety requirements.

Related: polyurethane and urethane flooring and concrete coating services.

Why are urethane systems commonly used in food facilities?

Urethane systems provide seamless sanitary protection, moisture resistance, thermal stability and chemical durability required in food processing and washdown environments.

Related: urethane cement flooring.

Are polyurethane flooring systems chemical resistant?

Yes. Properly specified systems resist oils, fuels, acids, sanitizers, cleaning chemicals, food byproducts and many industrial contaminants.

Related: polyurethane and urethane flooring and concrete coating services.

Can urethane flooring handle thermal shock?

Yes. Urethane cement systems are specifically engineered to resist thermal shock caused by steam cleaning, hot water washdowns and rapid temperature fluctuation.

Related: urethane cement flooring.

Where are polyurethane flooring systems commonly installed?

Polyurethane flooring systems are commonly installed in:

  • food processing facilities
  • beverage production plants
  • seafood processing facilities
  • commercial kitchens
  • pharmaceutical facilities
  • manufacturing plants
  • warehouses
  • industrial production environments

Related: concrete coating services.

What is the difference between epoxy and urethane flooring?

Epoxy systems are generally more rigid and commonly used for structural flooring assemblies, while urethane systems provide greater flexibility, thermal resistance and durability under aggressive industrial conditions.

What is urethane cement flooring?

Urethane cement is a heavy-duty industrial flooring technology engineered to withstand thermal shock, hot water washdowns, steam cleaning, moisture exposure and aggressive industrial operating conditions.

Related: urethane cement flooring.

What is polyurethane flooring?

Polyurethane flooring is a high-performance industrial flooring system designed for facilities requiring chemical resistance, thermal stability, abrasion durability and long-term operational performance.

Related: polyurethane topcoats.

Ready to Upgrade Your Floors?

Custom epoxy systems tailored for garages, basements, showrooms, patios, and industrial environments — combining industrial-grade durability with premium aesthetics.

How we work

Coated concrete floor by Epoxy Boss in Ontario
01

First Contact

Reach out by phone, email or our online form. We'll ask a few questions about your space, how it's used and the finish you have in mind, and review photos if you have them.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

Decision making

We help you choose the right system, finish, and colours based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.