Metallic Epoxy Floor Hamilton | Supplements King Retail Flooring Project (1,080 Sq Ft)

Metallic Epoxy Floor Hamilton | Supplements King Retail Flooring Project (1,080 Sq Ft)

Commercial
Application
Coating
Service
Metallic
System
Hamilton
Location
Gray
Color
1,080 sqft
Size
2025
Year
Hamilton
Location
1,080 sqft
Size
2025
Year
Coating
Service
Commercial
Application
Metallic
System
Gray
Color

Description

When Castone Construction brought us in for the Supplements King location in Hamilton, the challenge wasn’t just installing a floor - it was delivering a surface that could match both the pace of retail operations and the intensity of the brand experience.

The space started with a standard concrete slab - structurally sound, but dusty, visually flat, and inconsistent in finish. Left untreated, this type of surface quickly becomes a liability in a retail setting. It’s prone to:

  • Concrete dusting and surface breakdown
  • Staining from spills and foot traffic
  • Uneven wear under shelving and equipment
  • Ongoing maintenance issues

But beyond performance, the real gap was brand alignment.

Supplements King stores are built around energy, presentation, and visual impact. The floor isn’t just a surface — it’s part of the customer experience. A dull, unfinished slab would immediately undermine that identity. Castone needed a solution that could:

  • Deliver a clean, high-end showroom finish
  • Reflect light and enhance the retail space
  • Withstand constant foot traffic and heavy shelving
  • Maintain durability without ongoing upkeep
  • Be installed efficiently without disrupting the build schedule

This wasn’t just about coating concrete - it was about creating a floor that performs under pressure while elevating the entire space.

Solution

To meet both performance and design demands, we installed a multi-layer metallic epoxy flooring system built specifically for high-traffic commercial environments.

We began with mechanical surface preparation using diamond grinding, removing surface contaminants and opening the concrete pores to create the proper profile for maximum adhesion. This step is critical - it ensures the coating system bonds properly and prevents premature failure.

Next, we completed targeted crack repair and surface refinement, eliminating imperfections and creating a smooth, uniform substrate. This provided a flawless foundation for the coating system and ensured consistency across the entire 1,080 sq ft space.

With the surface prepared, we applied a 100% solids tinted epoxy basecoat, installed at the proper thickness to deliver:

  • Structural strength
  • Strong adhesion
  • Rich color depth

The defining feature of the system came with the metallic epoxy layer. Using controlled flow and free-pour techniques, we created a dynamic, three-dimensional finish with movement and depth. This high-gloss surface enhances light reflectivity and delivers the bold, modern aesthetic that aligns perfectly with the Supplements King brand.

To complete the system, we applied a satin-finish polyurethane topcoat, providing:

  • Resistance to abrasion and foot traffic
  • Protection against chemicals and spills
  • Long-term durability
  • Easy cleaning and maintenance for retail operations

Other projects

how we work

01

first touch with us

Reach out through our form, phone, email, or social media. This first step is focused on understanding your project scope, ideas, and functional needs while guiding you through how the process works.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

Decision making

We help you choose the right system, finish, and colors based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.