(905) 775-5901Talk to an estimator
Commercial concrete coatings that cure quickly and keep downtime minimal.
2025
3,200
Sq Ft
Concrete Coating
Education

Commercial concrete coatings that cure quickly and keep downtime minimal.

Epoxy Boss logo

Project Details

Application
Commercial
Industry
Education
Material
Polyaspartic
Region
GTA
City
Ajax

Gallery

Gallery

Trade school flake floor installed by Epoxy Boss in Ajax, Ontario
Trade school flake floor completed by Epoxy Boss in Ajax
Ajax trade school flake floor by Epoxy Boss, Ontario
Work on the trade school flake floor in Ajax by the Epoxy Boss crew
Trade school flake floor by Epoxy Boss, Ajax, Ontario
Trade school flake floor installed by Epoxy Boss in Ajax, Ontario
Trade school flake floor completed by Epoxy Boss in Ajax

Description

Skilled Trades College called us back for round five, this time for their Ajax 3,200 sq ft training facility that had seen better days. The floor was beaten up: old coatings were peeling, glue residue from past installs was still clinging on and visible cracks made the place look tired. Worst of all, the surface had become slick, which is a serious issue in a space packed with tools, boots and constant movement. They needed something that looked sharp but could also handle abuse from daily hands-on training no babysitting, just long-term performance and safety.

Solution

We proposed a high-performance flake system that tackled everything from safety to style. We started with PCD diamond tooling to strip off the failing coating and stubborn glue, followed by grinding the entire surface for optimal adhesion. After sealing up cracks, we laid down a tinted polyurethane basecoat that anchored the system. Then came the full flake broadcast classic blend, zero patchiness for both looks and grip. We sealed the deal with a polyaspartic topcoat infused with aluminum oxide, giving the floor added slip resistance without sacrificing gloss or cleanability. The result? A professional, durable, low-maintenance surface built to handle the daily grind. Epoxy Boss delivered on time, on spec and with zero micromanagement. That’s why they keep bringing us back.

Related Projects

Flake Garage Floor in King, Ontario
King Flake Garage Floor
~300
Sq Ft
Flakes System
King City
Garage Floor Coating
Flake Backyard Patio Coating in Vaughan, Ontario
Vaughan Flake Patio Coating
~400
Sq Ft
Flakes System
Vaughan
Patio
Flake Garage Floor in Innisfil, Ontario (2021)
Innisfil Flake Garage Floor 2021
~450
Sq Ft
Flakes System
Innisfil
Garage Floor Coating
Interior Epoxy Floor Coating in Guelph, Ontario
Guelph Interior Epoxy Floor
~200
Sq Ft
Metallic System
Basement & Indoor Spaces
Flake Entrance Landing and Steps in Barrie, Ontario
Barrie Flake Entrance & Steps
~100
Sq Ft
Flakes System
Barrie
Porch
Exterior Flake Entrance Coating in Halton Hills, Ontario
Halton Hills Exterior Flake Entrance
~150
Sq Ft
Flakes System
Halton Hills
Porch
Flake Garage Floor in Muskoka Lakes, Ontario
Muskoka Lakes Flake Garage Floor
~800
Sq Ft
Flakes System
Muskoka Lakes
Garage Floor Coating
Flake Floor Coating in Pickering, Ontario (2021)
Pickering Flake Floor Coating
~450
Sq Ft
Flakes System
Pickering
Garage Floor Coating
Flake Deck Coating in Tiny, Ontario
Tiny Flake Deck Coating
~300
Sq Ft
Flakes System
Tiny
Patio

Ready to Upgrade Your Floors?

Custom epoxy systems tailored for garages, basements, showrooms, patios, and industrial environments — combining industrial-grade durability with premium aesthetics.

How we work

Coated concrete floor by Epoxy Boss in Ontario
01

First Contact

Reach out by phone, email or our online form. We'll ask a few questions about your space, how it's used and the finish you have in mind, and review photos if you have them.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

Decision making

We help you choose the right system, finish, and colours based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.